Material and manufacturing

The main operations included laser cutting, press-brake bending and press riveting. A simple die was made to stamp the raised features on the enclosure. Surface finishing was outsourced. These operations were combined to manufacture this enclosure.

Sample inspection

After the samples were completed, full-dimensional inspection, trial assembly and visual inspection were carried out. Calipers were used for dimensional checks.

From the first batch to subsequent demand

The customer placed orders in batches, as shown below.

CPE enclosure order record
OrderMonthQuantityCurrent status
First orderAugust100 setsDelivered
Second orderSeptember300 setsDelivered
Third orderOctober500 sets plannedPreparing to order

Project delivery record

The recorded interval from sample confirmation to delivery for this project was 5 days.