Request an NDA before sharing controlled files, then send 2D/3D drawings or samples for DFM. HARVLAND supports no-MOQ sample discussion, tooling approval, quality records and repeat production for OEM/ODM programs.
Drawing review and quotesOEM/ODM ManufacturingMaterial, finish, tooling plan and inspection method agreed before production.
CAD drawing support
2D CAD drawings to 3D models. 3D models to 2D drawings.
We can help prepare the missing drawing or model for your metal part, based on your existing files and confirmed dimensions.
From a 2D drawing to a 3D model
The same support bracket in drawing views and a reconstructed model: see how the flanges, mounting tabs and formed panel relate. SGCC · 1.0 mm sheet.
2D drawing viewsView full-size image
Preparing interactive model
Drag to inspect
Interactive 3D support bracketDrag to inspect
Reconstructed from the supplied drawing for shape illustration. Local bend blends, threads and small reinforcement details are simplified. Manufacturing requires a confirmed drawing revision.
2D drawings → 3D models
Build a 3D CAD model from dimensioned 2D drawings to help review the part geometry and communicate project requirements.
Provide the latest 2D CAD drawing or a clearly dimensioned PDF.
Confirm units, material thickness and any missing dimensions before modeling.
Agree the 3D delivery format and required software version after file review.
3D models → 2D engineering drawings
Prepare 2D engineering drawings from an existing 3D model, with the views and annotations agreed for your project.
Provide the current 3D CAD model and drawing requirements.
Confirm views, dimensions, datums, tolerances, material and finish notes.
Agree the 2D delivery format and drawing revision before handoff.
What to send for a quote
Source files, revision and whether you need 2D to 3D or 3D to 2D.
Known dimensions, units, material/thickness and any mating-part requirements.
Required deliverables, intended use and target completion date.
From source file to confirmed deliverable
Review the files and clarify missing information.
Confirm scope, file formats, fee and turnaround.
Prepare the model or drawings for your review and revision approval.
Conversion follows the information you provide. Missing dimensions and tolerances need your confirmation; design changes, assembly validation and production release are agreed separately.
Please state “2D to 3D” or “3D to 2D” in your inquiry. Pricing and turnaround are confirmed after file review.
Short answer
HARVLAND supports OEM and ODM metal stamping programs from drawings or samples through DFM, tooling, samples, finishing, inspection and repeat production. An NDA is available before controlled files are shared. No-MOQ sample validation can be discussed when the route is feasible. ISO 9001 and ISO 14001 support supplier review; RoHS and REACH documents can be planned when the project requires them.
Drawing baseline
Confirm the revision and approval responsibility
Send the current 2D/3D files or sample, identify the part number and state which features are fixed or open to DFM proposals.
Request an NDA before sharing controlled files.
For projects starting from samples or requirements, agree who approves geometry and which design files are included.
Keep manufacturing changes subject to drawing approval before tooling or sample release.
Sample approval
Give each sample stage a clear acceptance purpose
Specify whether the sample is for geometry, assembly, finish or the intended production route; agree outstanding checks before release.
No-MOQ sampling can be discussed when material, tooling, finish and setup are feasible.
Define critical dimensions, burr direction, cosmetic faces and mating parts for the sample review.
Record the sample decision and remaining corrections before moving to pilot or repeat production.
Supplier documents
List required records before the quote
Put the supplier-review checklist, inspection evidence and material or finish documents into the RFQ so their availability and scope can be confirmed.
Existing ISO 9001 / ISO 14001 certificates support supplier review.
Identify any RoHS, REACH, material certificates or selected PPAP records required for the project; agree the available package.
Agree report format, critical inspection points and lot identification before sample approval.
Repeat orders
Release changes against an agreed supply baseline
Reference the approved drawing revision, sample decision, finish, inspection and packing instructions on repeat orders.
State order quantity, annual demand, delivery cadence, destination and protective packaging.
Send revised files with the changed features identified; confirm effects on tooling, price and timing before implementation.
Agree any new sample or inspection approval needed when material, finish or geometry changes.
DFM reviewbefore tooling decisions
±0.02 mm tolerancefor critical features, subject to drawing and process review
0.2–2.0 mmsheet thickness range
ISO 9001 / ISO 14001quality and environmental management systems
No MOQfor sample validation
Finish + inspectionplanned for your project
Buyer questions
Common buyer questions
Have a question about your part? Leave a message and a reply email.
01Do you support OEM and ODM projects?
Yes. OEM and ODM metal stamping projects can be reviewed from drawings or samples through DFM, tooling, samples, finishing, inspection and production.
02Can early projects be quoted without a high MOQ?
Yes. No MOQ support can be discussed for samples and early validation, with feasibility depending on material, tooling, finish and production setup.
03Who approves the design files in an OEM/ODM project?
Agree the drawing revision, geometry approval owner and required design-file deliverables before sampling. DFM proposals need buyer approval; an NDA is available on request before controlled files are shared.
04What should an OEM buyer send for review?
Send the latest 2D/3D drawings, samples or photos, file revision, application, material and thickness, finish, order quantity and annual demand, critical features, sample purpose, inspection and compliance records, packaging and target timing.
✓
Your question has been recorded
Thank you. We will reply to the email address you provided. You do not need to submit again.
Send the latest drawing revision or sample, approval owner, sample purpose, quantities, required records and packing instructions. Request an NDA before sharing controlled files.